Operate, measure and report
Plan a liquid cooling rollout. Lesson 4, 15 min.
A live system needs steady checks. Measure first, then report. Measure PUE and WUE PUE = total data centre energy / IT equipment energy (ISO/IEC 30134-2). WUE = site water use / IT equipment energy, in litres per kWh (ISO/IEC 30134-9). Example: a site uses 1,000,000 litres of water in a year and its…